Navy Study Says no More Wind Turbines at Amazon Site | Eastern North Carolina Now

    Publisher's note: The author of this post is Don Carrington, who is an executive editor for the Carolina Journal, John Hood Publisher.

Expanding Pasquotank County wind facility would interfere with operation of radar protecting U.S. coastline


    A new study from the U.S. Navy says expanding the Amazon Wind Farm site near Elizabeth City, as the operator planned to do, may cause interference with the Navy's radar-tracking facility in southern Virginia.

    The Navy released the executive summary of its study July 9. It concluded the interference produced by the existing 104 Amazon Wind Farm turbines is allowable based on a 2014 agreement between the Navy and the wind farm operator Avangrid Renewables. But Avangrid's to plan to add another 46 turbines could cause problems with the Relocatable Over-the-Horizon Radar.

    The ROTHR receiver plays a key role in the military's tracking of aircraft and ships suspected of transporting illegal drugs and other banned substances to the United States.

    Senate Majority Leader Harry Brown, R-Onslow, told Carolina Journal the executive summary confirmed what he had been told privately by military officials.

    "The report says no expansion of the wind turbines at this site," he said. In addition to the radar interference issue, Brown said he is concerned about compatibility with military training flights in eastern North Carolina. "[Active] military guys are reluctant to speak up. If you talk to retired military, these things [500-foot turbines] are concerns. We need to be cautious about permitting these," he said.

    The Amazon Wind Farm is North Carolina's only large-scale wind energy project.

    In January 2017, just before it went into full operation, North Carolina legislative leaders asked the Trump administration to consider shutting down the $400-million, 208-megawatt, 104-turbine project. State lawmakers said the massive turbines in Pasquotank County would interfere with ROTHR.

    Massachusetts Institute of Technology Lincoln Laboratory was the lead independent radar specialist organization for the study. The executive summary was four pages, but the Navy would not release the full report. "At this time, there is no releasable technical report to provide and the results were briefed to the Navy-led Mitigation Response Team with technical peer review provided by the ROTHR Program Office," Navy spokeswoman Katisha Draughn-Fraguada told CJ.

    Last year, the General Assembly instituted an 18-month moratorium on new North Carolina wind farms. The purpose of the moratorium was to allow the General Assembly time to study how wind projects and other development may pose a threat to military operations. The moratorium expires in December.

    In June 2012, the government's ROTHR Program Office released a study concluding that, to prevent interference with radar operation, a large-scale wind farm should be no closer than 28 miles from a ROTHR facility. The Navy released a map showing the "interference awareness area" relating to the ROTHR receiving facility in Virginia. The Amazon Wind Farm covers about 20,000 acres. It begins about 14 miles from the ROTHR facility stretching to a point about 22 miles away. It is entirely within the 28-mile interference awareness area described in the 2012 study.

    The Obama administration's Department of Defense reversed position in October 2014 and entered an agreement citing a goal "to ensure that the robust development of renewable energy sources."

    Under the agreement, the Navy would "discuss strategies" with Iberdrola Renewables [Avangrid] if the installation adversely affected radar operations. But under the agreement, if the turbines compromised the radar facility's effectiveness, the Navy had no option to terminate the project or force Avangrid to reduce the wind farm's operations.

    If the Navy detects an adverse impact from the turbines, the parties will "confer with the assistance of a mutually acceptable technical expert" and discuss strategies likely to prevent problems.

    The agreement also called for post-construction interference measurements, which formed the basis for the recent study.
Go Back


Leave a Guest Comment

Your Name or Alias
Your Email Address ( your email address will not be published)
Enter Your Comment ( no code or urls allowed, text only please )




The Most Important Counties in N.C. Politics Today Carolina Journal, Editorials, Op-Ed & Politics ‘Nix All Six’ on State Constitutional Amendments or Think Critically on Each One?


HbAD0

Latest Op-Ed & Politics

Police in the nation’s capital are not stopping illegal aliens who are driving around without license plates, according to a new report.
Davidaon County student suspended for using correct legal term for those in country illegally
Lawmakers and privacy experts on both sides of the political spectrum are sounding the alarm on a provision in a spy powers reform bill that one senator described as one of the “most terrifying expansions of government surveillance” in history
given to illegals in Mexico before they even get to US: NGOs connected to Mayorkas

HbAD1

committee gets enough valid signatures to force vote on removing Oakland, CA's Soros DA
other pro-terrorist protests in Chicago shout "Death to America" in Farsi
Only two of the so-called “three Johns” will be competing to replace Sen. Mitch McConnell (R-KY) as leader of the Senate GOP.

HbAD2

House Judiciary Chair Jim Jordan (R-OH) is looking into whether GoFundMe and Eventbrite cooperated with federal law enforcement during their investigation into the financial transactions of supporters of former President Donald Trump.

HbAD3

 
Back to Top